BEGIN:VCALENDAR
PRODID:-//Session events Calendar//IBA//EN
CALSCALE:GREGORIAN
VERSION:2.0
BEGIN:VEVENT
DTSTAMP:20260505T151750Z
DTSTART:20250329T080000Z
DTEND:20250329T092000Z
SUMMARY:Session one: Quantum issues in prolongation claims: lost opportun
 ities and counting the cost
DESCRIPTION:Are equipment costs time related or scope driven? Which time 
 period should delay costs be assessed (during the project or after the e
 xpiration of the planned performance period)? And should preliminary cos
 ts or just site overhead costs be used?\n
LOCATION:
UID:39ad5834-0ecf-45de-bc42-40db7239d229
END:VEVENT
END:VCALENDAR
